Ep.601 - The 6 Takt Steering & Control Strategies - Last Planner® Implementation Series

0 意见· 07/12/23
Elevate Construction
0

In this podcast we cover: The process to follow after zone control walks. What the walks are looking for. What are the 6 strategies to create flow once you have identified a problem.   If you like the Elevate Construction podcast, please subscribe for free and you’ll never miss an episode.  And if you really like the Elevate Construction podcast, I’d appreciate you telling a friend (Maybe even two 😊).   Also, here are links to our YouTube Channels: · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channe....l/UCzQDevqQP19L4LePu · LeanSurvey YouTube Channel: https://www.youtube.com/channe....l/UC-Ztn3okFhyB_3p5n · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg 

显示更多

 0 注释 sort   排序方式


下一个